Expertise Summary (1997 – 2008)

Work experience is more than 11 years, assembling knowledge from cement plant, gold and copper mining, and upstream oil and gas industry (offshore and onshore terminal). Most of those experiences are in the field of process control, automation, electrical, and instrumentation.  Familiar with programmable logic controller and distributed control system, human machine interface and SCADA, power generation and distribution, process, piping and pipeline. Besides operation day-to-day supports, in last several years, have been focusing to project management by managing and running capital and operation projects. The roles and responsibility thus covers engineering works, hazard analysis, Hazop/Hazid, JSA, MOC, and leading commissioning and start up.

Work Experience

Chevron Indonesia Company
(Initially was Unocal Indonesia Company, merged in August 2005)
Balikpapan, East Kalimantan, Indonesia

Field Engineer (2004- 2005)

Evaluate Facilities & Equipment Performance for 22 platforms in Yakin Field of South Area Operation in daily basis and make recommendation; Ensure the correct and availability of the data monitor for evaluation of facilities and equipment performance; Work with Production & Maintenance to improve Reliability and Availability; Coordinate with other department for projects; Start up Coordinator for new facilities/ facilities upgrade; Project Leader for any routine Maintenance & Operation projects including MOC, CRF, and MRF preparation

Facilities Engineer (2005-now)

Advance Facilities Engineer. Lead and manage capital and operation projects: seek opportunities, develop alternatives, improve, monitor, and optimize capital and expense projects. Review engineering design, hazard analysis, hazop/hazid, procedures, JSA, SOP. Lead commissioning and start up of new facilities. Support operation and maintenance system for South and North Area Operation. Direct and conduct safety and environmental procedures. Promote safety and environmental awareness referring to government regulations and international codes. Coordinate, provide and deliver technical solution to Operation team in problem solving and daily base activities.


Project History

Mahoni additional 3 wells: WHCP, instrumentation and electrical system, commissioning and start up. (2004)
Sepinggan 3rd Stage Compressor: instrumentation, commissioning and start up. (2004)
YN-5/6 ESP to PCP Well Conversion (2005)
STA Incident Investigation: Compressor Shutdown System (2005)
YO-11/15 PCP Wells Optimization (Upgrade surface facilities) (2005-2006)
Yakin Fuel Gas Upgrade (2005-2006)
Yakin Fire and Gas Detectors Integration System (2005-2006)
Yakin HP Separator Reconditioning (2005-2006)
Mahoni ESP Shutdown System (2005-2006)
Yakin Open and Close Drain Separation (2006)
Yakin Produced Water Handling (2006-2007)
Yakin North Bravo MCC and Control Room Upgrade (2006)
Yakin North Bravo Electrical Segregation (2006)
South Area Turn-Around for Yakin Field (2006-2007)
Serang Fire and Gas Detection and Fire Water System (2007-2008)
Serang Hazop Hazid Follow Up (2007-2008)
Attaka Cooling Water System Upgrade (2007)
Attaka ESP Installation (2008-2009)



============================================================================================

Oil and Gas Technology College
Balikpapan, East Kalimantan
Lecturer for Surface Facilities Operation (2005 - 2006)

============================================================================================

PT. Freeport Indonesia
Tembagapura, Irian Jaya, Indonesia (2000 - 2004)

Chief Engineer (2003- 2004)

Design, maintain and develop the Concentrating PLC system; supervise Process Control and PLC System engineers in their daily activities; manage capital and non-capital projects; assist long-term development plans to support the Concentrating Division in achieving production targets effectively and efficiently; Direct and conduct safety and environmental procedures for subordinates and himself, promote safety and environmental awareness referring to Company regulations; Coordinate, provide and deliver technical solution to Concentrating Division in Operation and control requirement to help problem solving and daily activities; Coordinate, Maintain and develop operation standard and diagnostic procedures; design and review the engineering design, drawing and specifications to ensure that they meet the standard.

Project History

Mill-74 Crusher Control System Upgrade as project manager: PLC application restructuring, DCS hardware and application programming, start-up and commissioning. (2004)
Dust Suppression System for Stock Pile (2004)
Fire Suppression System for Ore Flow Conveying System (2003)
Automatic Reporting, to provide plant world wide data auto reporting of maintenance time, daily production rate, un-scheduled down time, availability, utilization, and miscellaneous (2003-2004)

Process Control and PLC System Engineer (2000- 2003)

Design, maintain and develop the Concentrating PLC system; involved in capital and non-capital projects; assist long-term system development plans to support the Concentrating Division in achieving production targets effectively and efficiently; promote safety and environmental awareness referring to Company procedures and regulations; perform systems trouble shooting; recommend corrective and preventive action to related parties to maximize system availability and utilization; provide and deliver technical solution for equipment control system; maintain and develop systems operation and diagnostic procedures for proper guidance;  engineering design, maintenance, trouble-shooting, configuration, and documentation of the installed, FOXBORO I/A Series DCS, Wonderware HMI and Allen Bradley PLC; work closely with maintenance and operation departments for projects and daily activites

Project History

A US$ 9.8 millions Knelson Centrifugal Concentrator project: PLC hardware set up and application programming, DCS hardware set-up, start-up and commissioning. (2003)
First Out Alarm PLC and HMI configuration for Mill-74 area. (2003)
WRIM (Wound Rotor Induction Motor) Project, involved in start up and commissioning. (2002)
First Out Alarm PLC and HMI configuration for Ore Flow area. (2002)
Involve in the project and commissioning of Vertical Pressure Airdrying (VPA) for a new system of slurry concentrate dewatering and drying. (2002)
Crusher#7 Control System Commissioning Project of a +US$ 23.8 millions Crushing Unit in Grasberg as Project Manager, involved in start up and commissioning (2002)
Involve in the Crusher 6 and Crusher 7 Control Strategy Development. (2002)
Alarm Management system implementation:  Goal is to reduce process alarms to a “operator-meaningful state.”  Uptime is increased by lesser troubleshooting-fault-finding time (2002)
Fibre Optic Audit; analyzing communication performance between PLC Processors (2002)
Wonderware system configuring and implementation for operation/production purpose at mine area (2001 – 2003)
Variable Frequency Drive specifically for Allen Bradley Plus 1336 Installation (2001)
PLC-5 Programming using RSLogix5 and Wonderware HMI design and configuration for a +US$ 20 million Lime Mixing Plant, involved in start up and commissioning. (2001)

=======================================================================

PT. Semen Bosowa Maros
Maros, South Sulawesi, Indonesia (1998 - 2000)

Electrical and Instrumentation Engineer

Responsible for electrical construction supervision during construction phase (1.5 years): review engineering design, installation, start-up and commissioning; supervise electrical and instrumentation maintenance team: trouble-shooting and fault finding, upgrade control system using ABB Advant OCS, daily operation support, provide standard operating procedure, improve system reliability and availability.

Project History

Installation, start-up and commissioning for ABB Variable Frequency Drive (ACS-600, DCS-500, DCF-500, SamiStar, and a 5.5 MW Cycloconverter for cement mill)
Installation, start-up and commissioning for 150 KV (High Voltage), 11 KV (Medium Voltage) and 380V MCC (Low Voltage) Feeder Power Distribution and Protection
Erection, Installation, start-up and commissioning for a 15m long, 5m diameter and 5.5 MW ring motor
Installation, start-up and commissioning for Packer Machine
Installation, start-up and commissioning for soft starter and liquid starter for a high power motor
Installation, start-up and commissioning for Electrostatic Precipitator (EP)

========================================================================

Akademi Teknik Elektromedik (ATEM)
(Electromedic Engineering Academy) Muhammadiyyah Makassar (1999)
Lecturer for English and Medical Gas System subjects (for two semesters)

============================================================================================

PT. Freeport Indonesia
Tembagapura, Irian Jaya, Indonesia (1997)

Trainee Engineer (Freeport Co-op Student Program)

The six months job includes organizing and planning of preventive maintenance activities at unit shutdown; scheduling daily and weekly manpower allocations; monitoring and insuring parts availability; recording and analyzing instrument performance versus maintenance cost and determine parts with most frequent faults; bridge communication gaps between English-as-a-second language speakers and expatriates within the department; document and design instrument specifications for the right application; maintain an organized instrument filling system; provide inputs to the Instrumentation General Foreman on instrumentation yearly budgeting.

Project History

Ore Flow PLC-5 Allen Bradley Training Simulator for Maintenance Crew (design, installation and testing

Professional Trainings

Advance ControlLogix Training (5 days), Transavia Otomasi Pratama, Jakarta, December 2008
* Lean Six Sigma White Belt, Variance Reduction International, Balikpapan, June 2008
* ETAP (Electrical Transient Analysis Program) Introductory, MMPS, Jakarta, May 2008
* Process Modeling using Aspen HYSYS, Aspentech, Balikpapan, October 2007
* Liquid and Gas Hydrocarbon Flow Measurement, Chevron ETS, Singapore, July 2007
* Gas Engine Operation and Maintenance, Trakindo, Cileungsi, 2006
* Introduction to ControlLogix (1) ControlLogix system and hardware configuration, (2) RSLogix5000 programming software, (3) RSLogix5000 software troubleshooting; Transavia; Balikpapan, 2006
 * RSTechEd - lab training for Rockwell software and technology update,  Bangkok, 2006
* Detronic Eagle Quantum Premier integration system for fire and gas detection and protection, complete with ICONICS as HMI, Wifgasindo, Balikpapan, 2006
* ESP Application and Engineering: Basic Artificial Lift; REDA ESP Equipment, Operation, Monitoring and Failure Analysis, REDA Schlumberger, Singapore, 2004
* Foxboro IA Series System, (1) Integrated Process Control i.e. Control Block, Feedback and Feedforward Control Solution, Adaptive Control with PID Controller, Sequence Logic and HLBL Programming; (2) Integrated Configuration i.e. Hardware Configuration, Basic PID Controller, System Defenition, Display Builder, Configurator; Foxboro Invensys; Mount Wellington New Zealand, 2003
* Wound Rotor Induction Motor and Secondary Resistive Control, Sinergy Ltd, Tembagapura, 2003
* Programmable Logic Controller (1) RSLogix 5 Basic Programming, (2) RSLogix 5 Advanced Programming, (3) RSLogix 5 Software Troubleshooting, (4) Introduction to RSLogix 5000; Rockwell Automation; Jakarta; 2001
* PLC Networking (1) ControlNet Network Configuration, (2) DeviceNet Network Configuration, (3) Advanced ControlLogix Communication; Rockwell Automation; Jakarta; 2002
* Human Machine Interface: RSView32 configuration and programming, Rockwell Automation, Jakarta, 2002
* Cost Engineering, Freeport Indonesia, Tembagapura, 2003
* HMI and PLC: (1) Wonderware IntouchMMI for system integrator (including web publisher) and operator application, (2)Wonderware Intouch InSQL Server for trending and reporting, (3) RSLogix 5 Allen Bradley Programmable Logic Control, (4) Variable Frequency Drive (VFD) AC Series Allen Bradley; Freeport Indonesia, Tembagapura, 2000-2001
* Power Management Digital Protection Relay Training: SR-269, SR-469, etc., Guna Elektro, Tembagapura, 2001
* Electrical and Instrumentation: (1) High, Medium and Low Voltage Distribution and Protection, (2) Cycloconverter 5.5 MW for Ring Motor, (3) AC Motor Drive ACS-600 (1999), (4) DC Motor Drive DCS-500 and DCF-500, (5) Electrical Instrumentation Device; ABB Industrie AG Switzerland; Maros, 1999

* Instrumentation Maintenance, Fuller Ltd, Maros, 1998
* Siemens S-5 PLC, Ventomatic spa, Maros, 1998



Management Trainings

* Behavior Based Safety (2 days), Chevron, Balikpapan, November 2008
* Facilities Engineering Conference and CPDEP (Chevron Project Development and Execution Process) Forum, Houston Texas, April-May 2008
* PM-201 Project Management for Major Capital Project (using Chevron Project Development and Execution Process), Chevron Indonesia, Balikpapan, 2007
* PM-101 Basic Project Management (using Chevron Project Development and Execution Process), Chevron Indonesia, Balikpapan, 2006
* Loss Control and Modern Safety Management, Det Norske Veritas (DNV), Balikpapan, 2005
* Project Management, Edwin Management and Development Center (EMDC), Balikpapan, 2004
* 7 Habits of Highly Effective People, PT. Dunamis and Franklin Covey, Tembagapura, 2003
* Problem Solving and Decision Making, PT. FritMandiri and Kepner-Tregoe, Tembagapura, 2003
Competence and Work-ship Management,  Business Management, 6 Days Safety Supervisory Training, Supervisory Skill Development Program, Supervisory Developing Program,  Project Control in MIMS, ISO 14001 Implementation; Freeport Indonesia, Tembagapura, 2000-2003

References

William Edward Wakley
Planning, Engineering and Cost Control General Superintendent

Freeport Mc Moran INC
Freeport Indonesia Papua 99930
Phone: 62-901-416854
Fax: 62-901-416200
Date: 20 March 2001

Nanda Naidoo
Instrumentation Commissioning Senior Engineer
IBDE Department
ABB Industrie AG Switzerland
Phone:41-56-768411
Fax: 41-56-767333
Switzerland
Date: 18 February 1999

Steve Smith
Drive Service and Commissioning Senior Engineer
IBDE Department Drive Application
ABB Industrie AG Switzerland
Phone:41-56-4868624
Fax: 41-56-4867323
Switzerland
Date: 17 August 1998

Edgar Bird
Electrical Construction Manager
PEG s.a. Suisse
Phone:41-22-3437670
Fax: 41-22-3437673
4, rue du lievre – CP 356-1211 Suisse
Date: 20 January 1999

Jose F. Cruz
Maintenance Manager
PT Semen Bosowa Maros
Phone:62-411-372372
Fax: 62-411-372233
Desa Baruga, Kec. Bantimurung, Kab. Maros, South Sulawesi
Date: 19 April 2000

Donnie Mudianto
Electrical Maintenance Superintendent

Freeport Mc Moran INC
Freeport Indonesia Papua 99930
Phone: 62-901-418170
Fax: 62-901-418374
Date: 26 August 1997